Try Before You Buy

Download a free sample of any of our exam questions and answers

  • 24/7 customer support, Secure shopping site
  • Free One year updates to match real exam scenarios
  • If you failed your exam after buying our products we will refund the full amount back to you.

2026 Latest C_TS422_2504 dumps - Instant Download PDF [Q27-Q47]

Share

2026 Latest C_TS422_2504 dumps - Instant Download PDF

Updated Verified C_TS422_2504 Downloadable Printable Exam Dumps

NEW QUESTION # 27
When does the system trigger replenishment for a Kanban container?

  • A. When you set the container to Waiting
  • B. When you set the container to In transit
  • C. When you set the container to Full
  • D. When you set the container to Empty

Answer: D


NEW QUESTION # 28
For production orders cost object controlling (COC) can be carried out on an order related or product related basis. Which of the following do you have to consider?
Note: There are 2 correct answers to this question.

  • A. Orderrelated COC is beneficial in a flexible production environment.
  • B. Productrelated COC is used in manufacturing for coproducts.
  • C. In orderrelated COC individual production orders do NOT have cost segments.
  • D. In productrelated COC all costs are debited credited to a product cost collector.

Answer: A,D


NEW QUESTION # 29
What could be the reason for multiple commitments where several operations have the same scheduled dates on a work center after dispatching? Note: There are 2 correct answers to this question.

  • A. The work center has several individual capacities.
  • B. Alternative work centers are fully occupied.
  • C. The Finite Scheduling indicator is NOT set in the strategy profile.
  • D. The Change Planning Direction indicator is set in the strategy profile.

Answer: A,C


NEW QUESTION # 30
What are prerequisites for a production version to be selected for a production order? Note: There are 3 correct answers to this question.

  • A. The basic start date of the order must lie within the validity period of the production version.
  • B. The production quantity must only lie within the lot-size range of the routing in the production version.
  • C. The production quantity must lie within the lot-size range of the production version.
  • D. The production version must NOT be deleted.
  • E. The basic end date of the order must lie within the validity period of the production version.

Answer: A,B,C


NEW QUESTION # 31
What is the purpose of using a low level code?
Note: There are 2 correct answers to this question.

  • A. To determine the priority of alternative components inside the material BOM (bill of material)
  • B. To determine the use of subitems inside the material BOM (bill of material)
  • C. To determine the lowest explosion level at which a material occurs in all the product structures
  • D. To determine the sequence in which materials are planned in MRP

Answer: C,D


NEW QUESTION # 32
How can you achieve a feasible production plan in case of capacity constraints? Note: There are 3 correct answers to this question.

  • A. Increase the capacity supply in a timephased interval.
  • B. Determine a time period with available capacity on the planning board.
  • C. Execute an infinite production planning run for the critical resources.
  • D. Form optimum sequences to reduce setup times.
  • E. Reduce the planning time interval.

Answer: A,B,D


NEW QUESTION # 33
Which of the following automation options can you use for production orders? Note: There are 2 correct answers to this question.

  • A. You can use trigger points to automatically create rework orders via confirmations.
  • B. You can use mass processing to read PP master data for production orders.
  • C. You can use mass processing to set production orders to technically complete.
  • D. You can use the production scheduling profile to automatically set orders to technically complete.

Answer: A,C


NEW QUESTION # 34
What are the possible results of a production planning run in Advanced Planning (PP/DS)? Note: There are 2 correct answers to this question.

  • A. Planned order
  • B. Scheduling agreement schedule line
  • C. Purchase order
  • D. Production order

Answer: A,B


NEW QUESTION # 35
Which of the following are scheduling time elements for a production order?
Note: There are 3 correct answers to this question.

  • A. Float before production
  • B. Queue time
  • C. Setup time
  • D. Transit time
  • E. Load time

Answer: A,B,C


NEW QUESTION # 36
What is a prerequisite for consumption of planned independent requirements to take place for planning strategy 40 (Planning with final assembly)?

  • A. A sales order is delivered.
  • B. MRP creates a dependent requirement.
  • C. A sales order is created.
  • D. MRP creates a planned order.

Answer: C


NEW QUESTION # 37
Under what circumstances can you change the material type for a material if stocks reservations or purchasing documents exist? Note: There are 2 correct answers to this question.

  • A. The quantity value updates are the same.
  • B. The same batch management level is used.
  • C. The same account category is used.
  • D. The same base unit of measure is used.

Answer: A,C


NEW QUESTION # 38
What determines whether the planned independent requirements in dem management are consumed by other requirements? Note: There are 2 correct answers to this question.

  • A. Planning strategy
  • B. Requirements type
  • C. Requirements profile
  • D. Order type

Answer: A,B


NEW QUESTION # 39
Which chart types does the tabular planning table for capacity planning provide in SAP S/4HANA Cloud Private Edition?
Note: There are 2 correct answers to this question.

  • A. Work center capacities chart
  • B. Order (pool) chart
  • C. Orders (dispatched) chart
  • D. Capacity requirements chart

Answer: A,D


NEW QUESTION # 40
How can a material availability check be triggered automatically for a production order? Note: There are 2 correct answers to this question.

  • A. By order confirmation
  • B. By mass processing
  • C. By capacity planning
  • D. By order release

Answer: B,D


NEW QUESTION # 41
Which alternative item strategies are available in bills of material (BOMs) in SAP S/4HANA Cloud Private Edition? Note: There are 2 correct answers to this question.

  • A. First in first out (FIFO)
  • B. Simultaneous
  • C. Manual maintenance
  • D. 100% check

Answer: C,D


NEW QUESTION # 42
How can you set up a material as a phantom assembly? Note: There are 2 correct answers to this question.

  • A. Select a special procurement type inside the material master.
  • B. Use a special item category in your material BOM (bill of material).
  • C. Define the special procurement type inside the material BOM (bill of material).
  • D. Select a special MRP type inside the material master.

Answer: A,C


NEW QUESTION # 43
You want to verify that the properties of a component batch align with the required properties of the raw material intended for a specific process order. What function do you use to accomplish this?

  • A. Batch number assignment
  • B. Batch determination
  • C. Batch where-used list
  • D. Batch information cockpit

Answer: B


NEW QUESTION # 44
When working with the material status, for which business areas can you set a warning message?
Note: There are 2 correct answers to this question.

  • A. Plant Maintenance
  • B. Sales
  • C. Purchasing
  • D. Classification

Answer: A,B


NEW QUESTION # 45
Advanced Planning uses master data from SAP S/4HANA Cloud Private Edition. In which data objects can you set the Advanced Planning flag? Note: There are 2 correct answers to this question.

  • A. Work center
  • B. Production version
  • C. Plant
  • D. Material

Answer: A,D


NEW QUESTION # 46
Which standard item categories can you select inside a bill of material (BOM)?
Note: There are 2 correct answers to this question.

  • A. Class item
  • B. Non-plant item
  • C. WBS item
  • D. Work item

Answer: A,B


NEW QUESTION # 47
......

The Ultimate SAP C_TS422_2504 Dumps PDF Review: https://examboost.vce4dumps.com/C_TS422_2504-latest-dumps.html