NEW QUESTION # 27
When does the system trigger replenishment for a Kanban container?
- A. When you set the container to Waiting
- B. When you set the container to In transit
- C. When you set the container to Full
- D. When you set the container to Empty
Answer: D
NEW QUESTION # 28
For production orders cost object controlling (COC) can be carried out on an order related or product related basis. Which of the following do you have to consider?
Note: There are 2 correct answers to this question.
- A. Orderrelated COC is beneficial in a flexible production environment.
- B. Productrelated COC is used in manufacturing for coproducts.
- C. In orderrelated COC individual production orders do NOT have cost segments.
- D. In productrelated COC all costs are debited credited to a product cost collector.
Answer: A,D
NEW QUESTION # 29
What could be the reason for multiple commitments where several operations have the same scheduled dates on a work center after dispatching? Note: There are 2 correct answers to this question.
- A. The work center has several individual capacities.
- B. Alternative work centers are fully occupied.
- C. The Finite Scheduling indicator is NOT set in the strategy profile.
- D. The Change Planning Direction indicator is set in the strategy profile.
Answer: A,C
NEW QUESTION # 30
What are prerequisites for a production version to be selected for a production order? Note: There are 3 correct answers to this question.
- A. The basic start date of the order must lie within the validity period of the production version.
- B. The production quantity must only lie within the lot-size range of the routing in the production version.
- C. The production quantity must lie within the lot-size range of the production version.
- D. The production version must NOT be deleted.
- E. The basic end date of the order must lie within the validity period of the production version.
Answer: A,B,C
NEW QUESTION # 31
What is the purpose of using a low level code?
Note: There are 2 correct answers to this question.
- A. To determine the priority of alternative components inside the material BOM (bill of material)
- B. To determine the use of subitems inside the material BOM (bill of material)
- C. To determine the lowest explosion level at which a material occurs in all the product structures
- D. To determine the sequence in which materials are planned in MRP
Answer: C,D
NEW QUESTION # 32
How can you achieve a feasible production plan in case of capacity constraints? Note: There are 3 correct answers to this question.
- A. Increase the capacity supply in a timephased interval.
- B. Determine a time period with available capacity on the planning board.
- C. Execute an infinite production planning run for the critical resources.
- D. Form optimum sequences to reduce setup times.
- E. Reduce the planning time interval.
Answer: A,B,D
NEW QUESTION # 33
Which of the following automation options can you use for production orders? Note: There are 2 correct answers to this question.
- A. You can use trigger points to automatically create rework orders via confirmations.
- B. You can use mass processing to read PP master data for production orders.
- C. You can use mass processing to set production orders to technically complete.
- D. You can use the production scheduling profile to automatically set orders to technically complete.
Answer: A,C
NEW QUESTION # 34
What are the possible results of a production planning run in Advanced Planning (PP/DS)? Note: There are 2 correct answers to this question.
- A. Planned order
- B. Scheduling agreement schedule line
- C. Purchase order
- D. Production order
Answer: A,B
NEW QUESTION # 35
Which of the following are scheduling time elements for a production order?
Note: There are 3 correct answers to this question.
- A. Float before production
- B. Queue time
- C. Setup time
- D. Transit time
- E. Load time
Answer: A,B,C
NEW QUESTION # 36
What is a prerequisite for consumption of planned independent requirements to take place for planning strategy 40 (Planning with final assembly)?
- A. A sales order is delivered.
- B. MRP creates a dependent requirement.
- C. A sales order is created.
- D. MRP creates a planned order.
Answer: C
NEW QUESTION # 37
Under what circumstances can you change the material type for a material if stocks reservations or purchasing documents exist? Note: There are 2 correct answers to this question.
- A. The quantity value updates are the same.
- B. The same batch management level is used.
- C. The same account category is used.
- D. The same base unit of measure is used.
Answer: A,C
NEW QUESTION # 38
What determines whether the planned independent requirements in dem management are consumed by other requirements? Note: There are 2 correct answers to this question.
- A. Planning strategy
- B. Requirements type
- C. Requirements profile
- D. Order type
Answer: A,B
NEW QUESTION # 39
Which chart types does the tabular planning table for capacity planning provide in SAP S/4HANA Cloud Private Edition?
Note: There are 2 correct answers to this question.
- A. Work center capacities chart
- B. Order (pool) chart
- C. Orders (dispatched) chart
- D. Capacity requirements chart
Answer: A,D
NEW QUESTION # 40
How can a material availability check be triggered automatically for a production order? Note: There are 2 correct answers to this question.
- A. By order confirmation
- B. By mass processing
- C. By capacity planning
- D. By order release
Answer: B,D
NEW QUESTION # 41
Which alternative item strategies are available in bills of material (BOMs) in SAP S/4HANA Cloud Private Edition? Note: There are 2 correct answers to this question.
- A. First in first out (FIFO)
- B. Simultaneous
- C. Manual maintenance
- D. 100% check
Answer: C,D
NEW QUESTION # 42
How can you set up a material as a phantom assembly? Note: There are 2 correct answers to this question.
- A. Select a special procurement type inside the material master.
- B. Use a special item category in your material BOM (bill of material).
- C. Define the special procurement type inside the material BOM (bill of material).
- D. Select a special MRP type inside the material master.
Answer: A,C
NEW QUESTION # 43
You want to verify that the properties of a component batch align with the required properties of the raw material intended for a specific process order. What function do you use to accomplish this?
- A. Batch number assignment
- B. Batch determination
- C. Batch where-used list
- D. Batch information cockpit
Answer: B
NEW QUESTION # 44
When working with the material status, for which business areas can you set a warning message?
Note: There are 2 correct answers to this question.
- A. Plant Maintenance
- B. Sales
- C. Purchasing
- D. Classification
Answer: A,B
NEW QUESTION # 45
Advanced Planning uses master data from SAP S/4HANA Cloud Private Edition. In which data objects can you set the Advanced Planning flag? Note: There are 2 correct answers to this question.
- A. Work center
- B. Production version
- C. Plant
- D. Material
Answer: A,D
NEW QUESTION # 46
Which standard item categories can you select inside a bill of material (BOM)?
Note: There are 2 correct answers to this question.
- A. Class item
- B. Non-plant item
- C. WBS item
- D. Work item
Answer: A,B
NEW QUESTION # 47
......